Technical data: |
Combined Heat and Power – Equipment list
1. Heat recovery steam boiler including piping and control cabinet
Heat recovery boiler with lower and upper drum:
1. Superheater for saturated steam 217°C to 350°C (422°F to 662°F) 22bar (319psi); 7t/h
2. ECO flue gas heat exchanger
Feed water 103°C (217°F)
2. Flue gas pipes with steel construction (up to heat exchanger baffles)
3. Steam heater including piping
additional second steam superheater with ECO flue gas heat exchanger (natural gas fired; 936kW, V=107Nm³; can also be used for wood flue gas installations)
2. Superheater from 350°C to 450°C (662°F to 842°F) 22bar (319psi); 7t/h
Flue gas max. 1,100m³/h
Combustion air max. 950m³/h
Natural gas max. 150m³/h
4. High and low pressure distributor including piping and valves
5. High and low pressure turbine (KKK tandem turbine system, max. 1,500kW el.) including generator and all control cabinets
Exhaust steam 50°C (122 F), 0.12barabs (1.74psi)
6. Vacuum condenser including pump station and piping
7. Condensate reservoir (condensate collector station) including pumps and piping
8. Feed water reservoir – Deaerator including pumps and piping
9. Heat exchanger condensate – Feed water including piping
10. Feed water conditioning – Osmosis stage 1 + 2 and gravel bed filter cartridges
Feed water heat exchanger – Feed water from 98°C to 221°C (208°F to 430°F)
11. Cool down reservoir for sample taking including piping
12. RLT air conditioning unit for turbine room with control cabinet
13. Stairs and platform for high and low pressure distributor
14. Feeder for vacuum condenser and control cabinet
15. Conduits in plant room for turbines and RLT air conditioning unit
16. Extensive documentation, piping plans and drawings (31 A4 file folders)
17. Tool cabinets, shelves, spare parts, gaskets, etc.
The system has been assembled in 1994 and is in excellent used condition. It will be handed over dismantled. Approximately 10 trucks are required for transport.
|
|