Technical data: |
the brick work in West Germany was
only recently switched off and given to the sales freely. A
Hintermauerwerk concerns that a capacity of 30. Million NF (= brick
standard size) per annum has. With an extension of the dryer
capacities in the reconstruction at the destination, the capacity of
the work can be almost doubled. The work only built in the year 1992,
only the dressing originates again from the 60's. The work has an
electronic control Siemens S5. Beaconing the tunnel furnace takes
place with natural gas. The work can be changed over however at little
expenditure also to light oil (EL). A conversion to fuel oil is
possible, is however connected with higher expenditure. The cover of
the tunnel furnace was renewed 2005 in the burner zone. The work sold
as it lies and stands without any guarantee of the salesman. The dismantling must be made special and professionally by the buyer
or one of it assigned company. Same applies to packing and evacuation.
The salesman is to be again started ready for the buyer of the work
this and be let for two or three months run. In this time the
personnel of the buyer, who was to drive the work at the new location,
could be trained. It would be ideal, if the same personnel were
involved in the dismantling and reconstruction of the work. The work
is not subject to restrictions from the zielland. Inspection can be
organized at short notice. For questions I am available gladly. Price
is VB 2.438.000. With kind regards: STTi Ltd.