FAL engine assembly and testing lineFAL
FAL engine assembly and testing line
FAL
Year of construction
2020
Condition
Used
Location
Czechowice-Dziedzice 

Basic data
- Machine type:
- FAL engine assembly and testing line
- Manufacturer:
- FAL
- Year of construction:
- 2020
- Condition:
- used
Price & Location
- Auction start:
- 01.11.2026 at 15:55 o'clock
- Auction end:
- 31.12.2026 at 12:00 o'clock
- Location:
- Czechowice-Dziedzice, Polen

Call
Details about the offer
- Listing ID:
- A23339912
- Reference number:
- 2970001
- Update:
- 16.11.2026
Description
The lot consists of:
(1) FAL Motor Assembly and Testing Line (1)
Technical Details:
FAL Motor Assembly Line 1 – Technical Description
The FAL Motor Assembly Line 1 is a fully integrated production system for the assembly and testing of electric motors, located at the Valeo plant in Poland. The line is designed for high-volume automotive production and combines automated, semi-automated, and manual processes within a continuous material flow layout.
Basic information:
Cycle time: approx. 86 seconds per unit
TRP/OEE: approx. 85%
Total surface area: approx. 855 m²
Process Overview
The line consists of 25 sequential stations covering the complete assembly process from component loading to final packaging and reintegration.
Hsdpe Akk Rkjfx An Esfp
Initial assembly and housing preparation:
OP10: Robot-based component loading
OP20: Shrinking process (heating inner housing and joining stator)
OP30: Cooling tunnel
OP40: Manual assembly of X-ring and D-ring
OP50: Pre-assembly of outer housing
Core assembly and rotor integration:
OP60: Joining inner housing to outer housing
OP70: Rotor magnetization and measurement
OP80: Pre-assembly of A-shield and rotor insertion
OP90: Attaching A-shield to outer housing
OP110: Screwing A-shield
Intermediate assembly and component integration:
OP135: Manual interconnector assembly
OP136FA / OP136PA: Counter ring insertion, cooling cover joining, vent assembly
End-of-line handling and testing:
OP140: Transfer to EOL loop
OP150–190: End-of-line testing
OP230/240: Leak testing (test 1 and test 2)
OP245: Rotation test and EM graver verification
OP260: Laser marking and stamping
Final assembly and packaging:
OP270: Assembly of plugs, transportation cover, and cap
OP280: Final inspection and packaging
OP290: Reintegration process
The listing was translated automatically. Translation errors are possible.
(1) FAL Motor Assembly and Testing Line (1)
Technical Details:
FAL Motor Assembly Line 1 – Technical Description
The FAL Motor Assembly Line 1 is a fully integrated production system for the assembly and testing of electric motors, located at the Valeo plant in Poland. The line is designed for high-volume automotive production and combines automated, semi-automated, and manual processes within a continuous material flow layout.
Basic information:
Cycle time: approx. 86 seconds per unit
TRP/OEE: approx. 85%
Total surface area: approx. 855 m²
Process Overview
The line consists of 25 sequential stations covering the complete assembly process from component loading to final packaging and reintegration.
Hsdpe Akk Rkjfx An Esfp
Initial assembly and housing preparation:
OP10: Robot-based component loading
OP20: Shrinking process (heating inner housing and joining stator)
OP30: Cooling tunnel
OP40: Manual assembly of X-ring and D-ring
OP50: Pre-assembly of outer housing
Core assembly and rotor integration:
OP60: Joining inner housing to outer housing
OP70: Rotor magnetization and measurement
OP80: Pre-assembly of A-shield and rotor insertion
OP90: Attaching A-shield to outer housing
OP110: Screwing A-shield
Intermediate assembly and component integration:
OP135: Manual interconnector assembly
OP136FA / OP136PA: Counter ring insertion, cooling cover joining, vent assembly
End-of-line handling and testing:
OP140: Transfer to EOL loop
OP150–190: End-of-line testing
OP230/240: Leak testing (test 1 and test 2)
OP245: Rotation test and EM graver verification
OP260: Laser marking and stamping
Final assembly and packaging:
OP270: Assembly of plugs, transportation cover, and cap
OP280: Final inspection and packaging
OP290: Reintegration process
The listing was translated automatically. Translation errors are possible.
Your listing has been deleted successfully
An error has occurred