Recognised location: Ashburn (US) (Change)
Enter e-mail address
or
Move
6
Basic water treatment old load waste water detoxification R2xly9nvc System to the old load detoxification, detoxification, and Aufbereitugn by ground water or wastewater Built in approximately 1998 other data still unknown built in storage containers L x W x H: 2.98 x 2.42 x 2,59 m more
6
Chemical washing of ammonia for biogas plants and similar applications Fq0uuxj consisting of: Storage tanks, sumps, level indicators Overfill protection, leak probes, signalling device Documentation: 2.3 inspection certificate, Professional operating certificate, Manufacturer's instructions, approvals Z 40.11-271 and Z-40.21-7 Data sheets: Wire rope hoist level indicator, overfill protection, leakage detector, signal device more
6
Construction year 2011, started 2012 Products obtained : 16% Metal with impurities < 4% Textile fibres 4% Rubber granules from 2,5 to 3,5 mm. 40% Rubber granules from 0,8 to2,5 mm. 25% Rubber powder <0,8 mm. 15% Total installed power : 450 kW Total used power in work around 300 Kw Input : 1500/1700 kg/h of mixed tires Output : 1000/1300 kg/h depending on granule size and tires type. For car and truck tires Granule size : 0.1 – 1.3 – 3.5 mm. diam.with suitable grids can be seen running aver... more


Regenerati...
every day

New machines via email!

Be informed!

to

to

Change search

SELL IMMEDIATELY
on Europe's market leader for as little as € 0,79 per ad.
Find out more now


Phone: +44 (0) 20 806 810 84
or sell immediately
Try our Machineseeker app now!
Machineseeker app for iPhone and Android.
Want to really stop the chat history?
Yes No
×
Machine Finder chat
Name E-mail Your message to the Dealer
START CHAT WITH DEALER
  You are chatting with: 
  Your contact person: 
  
Your contact is typing
SEND MESSAGE
  You are chatting with: 
  Your contact person: 
  
Your contact seems to be inactive
Chat window close