Used Forging Furnace for sale (938)
Sort results
- Lowest price Highest price
- Newest listings Oldest listings
- Shortest distance Farthest distance
- Newest year of manufacture Oldest year of manufacture
- Latest update Oldest update
- Manufacturer A to Z Manufacturer Z to A
- Relevance
- Lowest price
- Price
- Highest price
- Price
- Newest listings
- Release date
- Oldest listings
- Release date
- Shortest distance
- Distance
- Farthest distance
- Distance
- Newest year of manufacture
- Year of construction
- Oldest year of manufacture
- Year of construction
- Latest update
- Update
- Oldest update
- Update
- Manufacturer A to Z
- Manufacturer
- Manufacturer Z to A
- Manufacturer
- designation from A to Z
- Description
- designation from Z to A
- Description
- Model from A to Z
- Model
- Model from Z to A
- Model
- Lowest reference
- Ref.No.
- Highest reference
- Ref.No.
- Shortest runtime
- Runtime
- Longest duration
- Runtime
- Relevance
- Relevance
Listing
Striegistal
8,035 km
Complete hardening bell furnace
SOLOSMARTHERM 60 90 6PG
Call
Condition: excellent (used), Year of construction: 2002, Consisting of:
- 2 pieces hardening furnaces 10 Cg gross weight 400 kg
- 1 piece of nitriding oven 8 Cg gross weight 400 kg
- 1 piece spray washing machine
Bedpfx Ajy H H U Isp Esdf
- 2 pieces tempering furnaces
- 1 piece of oil quench bath 5000 liters
- 1 piece manipulator
All technical data for the individual systems can be found in the attached pictures.
Listing
Striegistal
8,035 km
Tempering furnace
AichelinKES-4
Call
Condition: good (used), Year of construction: 1973, rust size: 700 x 650 x 1.100 mm
batch weight: 1.000 kg
Temperature: Max. 750 °C
Bdedpfx Ajy H H H Dop Esf
connected load: 78 kW
Equipment: Incl. Control system (should be renewed) + Charging machine
others: Furnace can be moved under nitrogen
Listing
Gelsenkirchen
7,653 km
Forging press
CalendeSchmiedepresse
Call
Condition: new, Year of construction: 2018, machine/vehicle number: DF0163, pressing force: 800 t, pressure:800 t
distance between columns:1200 mm
stroke:500 mm
total power requirement:85 kW
weight of the machine ca.:40 t
dimensions:4100 x 3500 x 6650 mm
draw back pressure:80 t
Master cylinder:1 Stück
column diameter:250 mm
dayligth:1000 mm
Table dimensions:1300 x 1100 mm
ram surface:1300 x 1100 mm
:800 mm
table height over floor:950 mm
table load:5 t
pre-running speed:250 mm/sec
return speed:150 mm/sec
:1000 l
:10 mm/sec
:inbegriffen ?
:inbegriffen ?
Bdsdpfxodxvfpo Ap Ejf
:inbegriffen ?
:inbegriffen ?
:inbegriffen (800 x 530mm) ?
:inbegriffen (800 x 530mm) ?
Listing
Italy
8,629 km
Fully overhauled Hot Radial Forging
CNC GFMSX-13
Call
Condition: refurbished (used), Year of construction: 1974, functionality: fully functional, machine/vehicle number: 1276, CNC Hot Radial Forging GFM SX-13
New in 1974 / 2022
New control system PLC SIEMENS S7
Machine number: 1276
No. of Hammers: 4
Forging force each hummer: 160 Ton
Hammer stroke / min: 700/min
Hammer lenght: 240 mm
Diameter setting range: 80 mm
Maximum forging diameter:
Structural steel, round-cross section: Ø 130 mm
square cross section: Ø 115 mm
Smallest dimensions forged: Ø 25 mm
Manipulator A max. displacement: 6820 mm
Manipulator B max. displacement: 7150 mm
Bdodpfxsq U R T Ne Ap Eof
Maximum workpiece length: 6000 mm
Rapid speed manipulator: 400mm/sec
Total connected power: 300 kW 380 V, 50 Hz
Machine dimensions:
Forging height over floor: 615 mm
Total height pf the machinr over floor: 1665 mm
Total machine lenght: 32670 mm
Total foundation lenght: 33400 mm
Tot. machine width (without auxliary equipments): approx 3885 mm
Total foundation width: 16000 mm
Total weight of the machine: 84.000 Kg
Listing
Italy
8,629 km
Fully overhauled Cold Radial Forging
CNC GFMSX-10
Call
Condition: refurbished (used), functionality: fully functional, Cold Radial Forging Machine GFM SX-10
YOM: 1971/2024
CNC: Siemens SINUMERIK ONE with PLC 1500
Forging Box
Number of forging hammers 4
Max. forging force per hammer 1250 kN
Number of strokes 1200 1/min
Hammer lenght 135 mm
Diameter setting range 60 mm
Bjdpfx Apoq U R Rus Ejdf
Forge eccentric 3,5 mm
Chuck head
Clamping force max. 50 kN
Advance speed max. 20000 mm/min
Stroke 1290 mm
Workpiece rotation 35-71 1/min
Workpiece lenght max. 900 mm
Counter holder
Clamping force max. 50 kN
Advance speed max. 20000 mm/min
Stroke 1290 mm
Mandrel
Clamping force max. 20 kN
Advance speed max. 18000 mm/min
Stroke 800 mm
Dimensions
Lenght approx: 9100 mm
Width (with electrical cabinets and control panel) approx.: 4500 mm
Height forging machine approx.: 2150 mm
Forging height above floor: 1250 mm
Weight (forging machine) approx.: 29000 kg
The machine is completely revamped with a new Electrics, Hydraulics, new Control and with functionality test before delivery.
Discover more used machines
Listing
Italy
8,629 km
Completely overhauled Hot Radial Forging
CNC GFMSX-16
Call
Year of construction: 1974, condition: refurbished (used), functionality: fully functional, machine/vehicle number: 1293, CNC Radial Forging Machine GFM mod. SX-16
Manufacture: GFM (Austria)
YOM: 1974 / 2022
Model: SXL-16
Machine number: 1293
PLC: Siemens S7 - Technology V4.2 with CNC Bosch Rexroth XM
Numbers of Hammers: 4
Forging force: 800 Ton (200 t per Hammer)
Strokes per minute: 580
Bdedpfx Apeq U Sa Se Eef
Hammer length: 320 mm
Maximum hammer setting scope
- calculated by diameter: 100 mm
Maximum diameter of forging regarding:
- structural steel: circular cross section – Ø 160 mm
square cross section – 130 mm
- high alloy steel: circular cross section – Ø 120 mm
square cross section – 100 mm
Extreme quadrangle: 12 x 120 mm
Maximum length of forging: 6000 mm
Min and Max diameter
of mounting in manipulator: 30 - 160 mm
Feed of manipulator A: 6800 mm
Feed of manipulator B: 7200 mm
Passage through manipulator: Ø 130 mm
Manipulators speed in fast move: 400 mm/s
Feed speed of manipulators
(stepless adjustment): 10 ÷ 115 mm/s
Cooling water pressure: 3 ÷ 5 bar
Temperature of inlet water: max. 30˚C
Cooling water consumption: 34m3/h
Pipe diameter for cooling water: 2”
Compressed air pressure: min. 5 bar
Pipe diameter for compressed air: Ø20 mm
Consumption of compressed air: 1,5 Nm3/h
Power supply (nominal power): 350 kW
Motor voltage: 500 V
Control voltage 220 V
Power of main engine: 200 kW
Power of pump motors: 185 kW
Power of manipulators motors: 2 x 22 kW
Dimensions of the machine
Axis height of forging above the hall level: 750 mm
Maximum height of machine above the hall level: 2.050 mm
Maximum length of machine on the hall level: 33.740 mm
Foundation length: 34.200 mm
Maximum width of machine on hall level without
loading equipment: 4350mm
Foundation width: 15.600mm
Machine net weight: 124.490 kg
Listing
Dortmund
7,674 km
El. heated salt bath continuous furnace
KohnleBLH 950-650/100-5000
Call
Condition: excellent (used), functionality: fully functional, El. heated salt bath continuous furnace system, make Kohnle
consisting of
Magnetic feeder
Hardening furnace
Type: BLH 950-650/100-5000
Bdsdpjy Uuwmefx Ap Esf
Temperature: max. 950°C
Throughput: 200 kg/h
Conveyer belt width: 620 mm
Effective height: 90 mm
Connected load: 160 kW
Heated length: 5.000 mm
Temperature control zones: 5
Throughput speed: 170 - 20 mm/min.
Time in the heating zone: 30 - 240 minutes
Gases used: nitrogen, methanol, natural gas, ammonia, propane
Salt bath
Salt: AS200
Washing system
Listing
Dortmund
7,674 km
El. heated salt bath continuous furnace
KohnleBLHE 950-650/100-5000
Call
Condition: excellent (used), El. heated salt bath continuous furnace system, make Kohnle
Bdodpfsy Uuu Ejx Ap Eof
consisting of
Magnetic feeder
Hardening furnace
Type: BLH 950-650/100-5000
Temperature: max. 950°C
Throughput: 200 kg/h
Conveyer belt width: 620 mm
Effective height: 90 mm
Connected load: 160 kW
Heated length: 5.000 mm
Temperature control zones: 5
Throughput speed: 170 - 20 mm/min.
Time in the heating zone: 30 - 240 minutes
Gases used: nitrogen, methanol, natural gas, ammonia, propane
Salt bath
Salt: AS200
Washing system
Listing
Dortmund
7,674 km
El. heated continuous furnace system
SAFEDT 80/54 Ti
Call
Condition: excellent (used), El. heated continuous furnace system, make Safed
consisting of:
Magnetic feeder
Hardening furnace
Type: T 80/54 Ti
Throughput: 540 kg/h
Temperature: max. 950°C
Conveyor belt: effective width 600 mm
Effective height: 100 mm
Bedjy Ur Aaopfx Ap Esdf
Heating power: 229 kW
Heating length: 7.200 mm
Temperature control zones: 9
Processing time: 15 - 150 minutes
Gases used: nitrogen, methanol, ammonia, propane
Oil quenching bath
Liquid capacity: 4000 l
Bath temperature: max. 80°C
Washing system
Annealing furnace
Listing
Tata
8,559 km
Gas-fired paint-burning furnace
Elektroszinter1200 x 1200 mm, 170-220 ° C
Call
Year of construction: 1995, condition: ready for operation (used), Product: Electrosinter
Bsdpfx Aog R Sh Ajp Esdf
Year of production: 1995
Air transport: 2x9000m3
Airspace / Capacity: 32m3
Oven opening: 1200 x 1200mm // 80 x 1500mm
Heat load: 55-160kW G20 natural gas
Air temperature: 170-220 ° C
Enclosure size: 2600 x 10300 x 3600mm
Electrical cabinets included.
It requires electronic and mechanical renovation.
Purchase of industrial equipment and machinery.
Wide Range of Used Machinery, Industrial Equipment
Listing
Dortmund
7,674 km
HEESS hardening press with IPSEN rotary hearth furnace
Heess/IPSEN
Call
Condition: good (used), HEESS Hardening Press with IPSEN Rotary Hearth Furnace.
Technical Key Data (Furnace):
Process: Carbonitriding
Workpieces: Gear components, up to Ø 260 mm, 4.7 kg
Throughput: approx. 96 parts/hour
Dwell time: approx. 56 min
Bdodpsy Dd Adjfx Ap Esf
Temperature range: 820–960 °C
Max. temperature: 1000 °C
Uniformity: ±5 K
Atmosphere: Endogas with propane/ammonia
C-potential: approx. 0.9 %C
Furnace: Ø 3000 mm, usable height 750 mm
Energy:
electric: 33 kVA
natural gas: approx. 19 m³/h
HEESS Hardening Press:
Pressing force: 300 kN
Workpieces: Ø 60–250 mm, height 10–98 mm
Cycle/process parameters:
Pressing time: 0.1–10 min
Pre-cooling time: 0–100 s
Quenching medium: up to 300 l/min
Handling:
Manipulator + gantry robot (Siemens servo drives)
Listing
Weiterstadt
7,845 km
Hardening furnace
HeraeusKM 260
Call
Year of construction: 1985, condition: used, Hardening furnace, Heraeus
Bodjgtxuqspfx Ap Eedf
Type KM 260
Width 250 mm, height 150 mm, depth 500 mm
Temperature up to 1150 °C
Listing
Germany
7,694 km
Vertical retort furnace
VEISCO_EB
Call
Year of construction: 2015, condition: new, Vertical furnace
height: 1100mm
useable diameter: 790mm
outside diameter: 1560 mm
outer height (without lid): 1480mm
outer height (with lid): 2300mm
electrically heated: 40 kW
circulating fan: 2,2 kW
three-phase supply: 400 V, 50 Hz
Bodpscdi D Dsfx Ap Ejdf
temperature: max. 750°C
Listing
Guipúzcoa
7,564 km
AICHELIN ROTARY FURNACE
AICHELINRDLGs-R-SJ-1,5m²
Call
Year of construction: 1990, operating hours: 16,400 h, condition: good (used), AICHELIN ROTARY FURNACE WITH HESS PRESS AND WASHING MACHINE
description: Rotary hearth furnace AichelinModel: RDLGs-R-SJ-1,5m.
Year: 1990
External dimensions: 2460 x 2460 x 2335mm
Operation: Gas fired with 4 Rekumat self-recovery radiant tube burners.
Consumption electrical connection: Connection voltage 380V/50Hz Control voltage 220V/50Hz
Total nominal consumption 15Kva Nominal consumption motors 11,7Kva Max.
temperature: 950º
Cycle time approx. 50 seconds.
Hess PressModel : HP 1-48
Year : 1990
Outside dimensions : 1830 x 1650 x 2630mm
Empty Weight: 3000kg
Max Cooling Unit: 230kg of SteelMax
Workpiece Size: Approximately 210mm
Caber Washing MachineModel: 350 T
Year: 1990
Outer dimensions: 7100 x 1470 x 2700mm
Unladen weight: 4000kg
Loading height: 1180mm
Bedsnzhx Hepfx Ap Esdf
Listing
Wiesbaden
7,810 km
Chamber furnace
ROHDEKE 230 S
Call
Year of construction: 1997, condition: like new (used), Maximum temperature: 1290 °C
Interior dimensions: 630 x 530 x 760 mm
Bjdpfx Apjt Ebpuj Esdf
Electrical connection: 400 V kW
Space required: 1200 x 870 x 1810 mm
Weight: 470 kg
Heating output: 16.5 kW
Listing
Strassberg
7,985 km
Knuckle Joint Press
BARNAULKB8340 - Complete forging line
Call
Condition: used, Year of construction: 2019, Pressure total: 1000 ton
Stroke: 170 mm
Shut height (stroke down, adjustment up): 490 mm
Slide adjustment: 16 mm
Max. stroke rate: 32 s.p.m.
Table surface area : 800x800 mm
Ram surface: 825x860 mm
Free frontal opening L-R: 900 mm
Upper ejector stroke: 16 mm
Upper ejector capacity: 10 ton
Lower ejector stroke: 80 mm
Lower ejector capacity: 32 ton
Dimensions L x W x H: 2950x1950x4090 mm
Machine weight: 26 kg
Main drive: 33,5 kW
Standard configuration
PRESS :original mechanical parts
all other components are European brands and standards (lubrication, electrical, pneumatic...)
Bdjdpfx Aeywztgsp Eef
Extended machine accessories
Full line ready to produce including :
*New AMIDEC (France) 2 axis transfer arm, equipped with: 2 grippers for the handling of billets1 nozzle for cleaning and lubrication of forging tools
*New Induction s.r.l. (Italy) heater 200kW designed to heat carbon steel billets diameter 24 to 75,5mm, length 22,1 to 33,1mm. 700 to 800°CScope of supply of the heating systemA/ M.F. Static converter model IHFT 200 K4B/ Frame for the M.F. capacitors and inductorsC/ automatic loading system for disc-shaped billets with reversible box- Tilting box- Storage conveyor- Vibrating bowl- Command and control cabinet- Steel support - Soundproof cabineD/ 1 system for the introduction of the billets to the inductor and 1 system for exit of the billets.E/ Inclined inductor length 1200mm with inox pipe F/ 1 automatic inductors exchange double version (for 2 inductors)G/ 1 optical pyrometer H/ 1 integrated dry supply transformerI/ PLC Siemens S1500 installed on the converterJ/ Cooling system
Tools
Listing
Germany
7,870 km
Retort Furnace
PFS AnlagenbauRetortenofen
Call
Condition: ready for operation (used), A retort furnace PFS Anlagenbau UG for gas nitriding, nitrocarburizing, and tempering is available. Load weight range: 750kg-6000kg, max. operating temperature: 750°C, treatment chamber dimensions X/Y/Z: 1800mm/900mm/900mm, number of burners: 4, burner type: recuperative, burner output: 4×80kW, loading height: 1200mm, max. evacuation temperature: 350°C, retort material: 1.4841, circulator air volume flow: 10000m³/h, nitriding system manufacturer: Process-Electronic, vacuum pump capacity: 240m³/h, total pressure: below 0.7mbar, max. operating pressure: 1.45bar. Documentation available. An on-site inspection is possible.
Bodpey N Uxgjfx Ap Esdf
Listing
Skarżysko-Kamienna
8,438 km
Powder coating furnace oven
ROMERCuring Oven SL Series
Call
Condition: new, Year of construction: 2025, Curing ovens shown in the photos can vary in price depending on size, configuration, and optional features. 💡📏⚙️
At ROMER, we manufacture both standard models and fully bespoke solutions, tailored to your process requirements. 🏭✅
Tell us your part size, line capacity, curing profile, and available space - and we will propose the best setup and the options that actually improve daily performance. 🔥🎯
🧠📡 Control and monitoring
Live process control for temperature, time, airflow, and modes - with alarms and saved recipes for repeatable cycles. 🔁✅
🔥🧩 Heating module
Fast heat-up and stable temperature thanks to efficient heating elements and quick energy transfer. ⚡🌡️
🌀💨 Air circulation
Uniform airflow reduces temperature differences for consistent coating quality. 🎯✅
🧱❄️ Insulation and design
Smart chamber construction minimizes heat loss - faster reaching setpoint, lower consumption. ♻️📉
🛡️⚠️ Safety and certification
Sensors, interlocks, and protection logic increase safety and reliability. 🔒👷
⚡💰 High efficiency
Optimized heat transfer and reduced losses mean real operating savings. 📉🔥
⏰🤖 Automatic start
Programmable schedule - automatic preheating before the shift for smoother production starts. ⏱️✅
🚪🔒 Self-latching doors + intelligent chimney
Prevents accidental opening, chimney activates only when needed for safer operation. 🧯✅
Bodpfxsfx Nfms Ap Eodf
🌿🔋 ECO mode
Low-energy standby when idle - fuel consumption reduction up to 20% (depending on process). 🌱📉
👀💡 View and lighting
Inspection without opening the door - fewer temperature drops, easier supervision. ✨👁️
🛤️🔥 Guide rails + automatic hood
Heat hood runs only during loading to reduce temperature loss, automatic rail infeed improves ergonomics and loading speed. 🙌⚙️
🎛️🌡️ MULTI-ZONE HEAT
Independent zone control for uniform curing of parts with different mass and geometry. 🧩✅
🧠♨️ MTS system
Heating elements mounted without thermal bridges - higher efficiency and faster time to set temperature. ⚡⏱️
2-in-1 🧱↔️🧱 Split chamber
Movable partition for two independent zones - drying and curing in one unit for maximum flexibility. 🚀🔁
🎚️🌀 VFD ventilation
Variable fan speed based on chamber conditions - better control and lower electricity use. ⚙️💡
Listing
Skarżysko-Kamienna
8,438 km
Industrial furnace
ROMERSW-SL
Call
Year of construction: 2020, condition: new, 7 "Touch Panel
The large color touch panel looks aesthetically and is comfortable and intuitive to use. You will set all important parameters on it.
Memory of 20 programs with 10 events
It is possible to save up to 20 programs and activate up to 10 consecutive time-temperature events arranged in the heating curve.
This is especially needed for more demanding processes.
Information on gas / oil consumption
The consumption is calculated based on the burner settings. This feature will allow you to estimate the cost of a given cycle, plan consumption and check personnel. Dual-channel recorder of USB cycle parameters
Each furnace is equipped with a recorder that records all firing parameters, including two temperature channels - like in an airplane black box, on a USB flash drive.
The system also enables the analysis of monthly / daily statements, including media consumption and performance. Each start of heating, opening the door, can be recreated, a few years back.
Such a dedicated option is not offered by any manufacturer. It is a system developed from scratch by our programmers Automatic smoke exhaust chimney
The chimney can be programmed to open a few minutes before the end of the firing in order to smoke the chamber.
It can be remotely controlled from the panel, it does not need to be done mechanically as in most structures.
Minute forecast until the end
The cycle has started, how long will it end? calculating the heating dynamics, we will count it and show on the display how much longer it will take.
To open it, just pull the door. The lock has adjustable pressure of the door, to close it just push it, the lock will catch the door and automatically pull it back.
In order to minimize the effect of heating the hall when opening the door, a hood is installed above the door to remove some of the heat to other places. The MTS system was created to provide a real reading of the temperature of the furnace chamber.
Standard measurement is based on one temperature measurement which is often wrong.MTS is a system of many sensors located in the outermost places of the chamber. The multi-zone heating system ensures a firing quality that has been so far unique.
Each normal oven has only one heating zone and only one temperature measurement!
The multi zone heat system supports up to 8 independent heating zones in one oven.
Each heating zone has as many as 3 temperature sensors!
Bedpfx Apofz U Tqo Esdf
When there are temperature differences between zones, they are automatically equalized!
The system helps to combat the problem when elements of different material thicknesses enter the furnace.
Listing
Skarżysko-Kamienna
8,438 km
Heating furnace for powder paint
ROMERCuring Oven SW Series
Call
Condition: new, Year of construction: 2025, Curing ovens shown in the photos can vary in price depending on size, configuration, and optional features. 💡📏⚙️
At ROMER, we manufacture both standard models and fully bespoke solutions, tailored to your process requirements. 🏭✅
Tell us your part size, line capacity, curing profile, and available space - and we will propose the best setup and the options that actually improve daily performance. 🔥🎯
🧠📡 Control and monitoring
Live process control for temperature, time, airflow, and modes - with alarms and saved recipes for repeatable cycles. 🔁✅
🔥🧩 Heating module
Fast heat-up and stable temperature thanks to efficient heating elements and quick energy transfer. ⚡🌡️
🌀💨 Air circulation
Uniform airflow reduces temperature differences for consistent coating quality. 🎯✅
Bdjdpfjfz I Rxex Ap Ejf
🧱❄️ Insulation and design
Smart chamber construction minimizes heat loss - faster reaching setpoint, lower consumption. ♻️📉
🛡️⚠️ Safety and certification
Sensors, interlocks, and protection logic increase safety and reliability. 🔒👷
⚡💰 High efficiency
Optimized heat transfer and reduced losses mean real operating savings. 📉🔥
⏰🤖 Automatic start
Programmable schedule - automatic preheating before the shift for smoother production starts. ⏱️✅
🚪🔒 Self-latching doors + intelligent chimney
Prevents accidental opening, chimney activates only when needed for safer operation. 🧯✅
🌿🔋 ECO mode
Low-energy standby when idle - fuel consumption reduction up to 20% (depending on process). 🌱📉
👀💡 View and lighting
Inspection without opening the door - fewer temperature drops, easier supervision. ✨👁️
🛤️🔥 Guide rails + automatic hood
Heat hood runs only during loading to reduce temperature loss, automatic rail infeed improves ergonomics and loading speed. 🙌⚙️
🎛️🌡️ MULTI-ZONE HEAT
Independent zone control for uniform curing of parts with different mass and geometry. 🧩✅
🧠♨️ MTS system
Heating elements mounted without thermal bridges - higher efficiency and faster time to set temperature. ⚡⏱️
2-in-1 🧱↔️🧱 Split chamber
Movable partition for two independent zones - drying and curing in one unit for maximum flexibility. 🚀🔁
🎚️🌀 VFD ventilation
Variable fan speed based on chamber conditions - better control and lower electricity use. ⚙️💡
Listing
Skarżysko-Kamienna
8,438 km
Powder coating furnace oven
ROMERCuring Oven SW Series
Call
Year of construction: 2025, condition: new, Curing ovens shown in the photos can vary in price depending on size, configuration, and optional features. 💡📏⚙️
At ROMER, we manufacture both standard models and fully bespoke solutions, tailored to your process requirements. 🏭✅
Tell us your part size, line capacity, curing profile, and available space - and we will propose the best setup and the options that actually improve daily performance. 🔥🎯
🧠📡 Control and monitoring
Live process control for temperature, time, airflow, and modes - with alarms and saved recipes for repeatable cycles. 🔁✅
🔥🧩 Heating module
Fast heat-up and stable temperature thanks to efficient heating elements and quick energy transfer. ⚡🌡️
🌀💨 Air circulation
Uniform airflow reduces temperature differences for consistent coating quality. 🎯✅
🧱❄️ Insulation and design
Smart chamber construction minimizes heat loss - faster reaching setpoint, lower consumption. ♻️📉
🛡️⚠️ Safety and certification
Bsdpfxsfzb Rcs Ap Esdf
Sensors, interlocks, and protection logic increase safety and reliability. 🔒👷
⚡💰 High efficiency
Optimized heat transfer and reduced losses mean real operating savings. 📉🔥
⏰🤖 Automatic start
Programmable schedule - automatic preheating before the shift for smoother production starts. ⏱️✅
🚪🔒 Self-latching doors + intelligent chimney
Prevents accidental opening, chimney activates only when needed for safer operation. 🧯✅
🌿🔋 ECO mode
Low-energy standby when idle - fuel consumption reduction up to 20% (depending on process). 🌱📉
👀💡 View and lighting
Inspection without opening the door - fewer temperature drops, easier supervision. ✨👁️
🛤️🔥 Guide rails + automatic hood
Heat hood runs only during loading to reduce temperature loss, automatic rail infeed improves ergonomics and loading speed. 🙌⚙️
🎛️🌡️ MULTI-ZONE HEAT
Independent zone control for uniform curing of parts with different mass and geometry. 🧩✅
🧠♨️ MTS system
Heating elements mounted without thermal bridges - higher efficiency and faster time to set temperature. ⚡⏱️
2-in-1 🧱↔️🧱 Split chamber
Movable partition for two independent zones - drying and curing in one unit for maximum flexibility. 🚀🔁
🎚️🌀 VFD ventilation
Variable fan speed based on chamber conditions - better control and lower electricity use. ⚙️💡
Trust Seal
Dealers certified through Machineseeker

Listing
Skarżysko-Kamienna
8,438 km
Industrial furnace
ROMERSW
Call
Condition: new, Year of construction: 2026, Curing ovens shown in the photos can vary in price depending on size, configuration, and optional features. 💡📏⚙️
At ROMER, we manufacture both standard models and fully bespoke solutions, tailored to your process requirements. 🏭✅
Tell us your part size, line capacity, curing profile, and available space - and we will propose the best setup and the options that actually improve daily performance. 🔥🎯
🧠📡 Control and monitoring
Live process control for temperature, time, airflow, and modes - with alarms and saved recipes for repeatable cycles. 🔁✅
🔥🧩 Heating module
Fast heat-up and stable temperature thanks to efficient heating elements and quick energy transfer. ⚡🌡️
🌀💨 Air circulation
Uniform airflow reduces temperature differences for consistent coating quality. 🎯✅
🧱❄️ Insulation and design
Smart chamber construction minimizes heat loss - faster reaching setpoint, lower consumption. ♻️📉
🛡️⚠️ Safety and certification
Sensors, interlocks, and protection logic increase safety and reliability. 🔒👷
⚡💰 High efficiency
Optimized heat transfer and reduced losses mean real operating savings. 📉🔥
⏰🤖 Automatic start
Programmable schedule - automatic preheating before the shift for smoother production starts. ⏱️✅
🚪🔒 Self-latching doors + intelligent chimney
Bsdefz Anpepfx Ap Eedf
Prevents accidental opening, chimney activates only when needed for safer operation. 🧯✅
🌿🔋 ECO mode
Low-energy standby when idle - fuel consumption reduction up to 20% (depending on process). 🌱📉
👀💡 View and lighting
Inspection without opening the door - fewer temperature drops, easier supervision. ✨👁️
🛤️🔥 Guide rails + automatic hood
Heat hood runs only during loading to reduce temperature loss, automatic rail infeed improves ergonomics and loading speed. 🙌⚙️
🎛️🌡️ MULTI-ZONE HEAT
Independent zone control for uniform curing of parts with different mass and geometry. 🧩✅
🧠♨️ MTS system
Heating elements mounted without thermal bridges - higher efficiency and faster time to set temperature. ⚡⏱️
2-in-1 🧱↔️🧱 Split chamber
Movable partition for two independent zones - drying and curing in one unit for maximum flexibility. 🚀🔁
🎚️🌀 VFD ventilation
Variable fan speed based on chamber conditions - better control and lower electricity use. ⚙️💡
Listing
Skarżysko-Kamienna
8,438 km
Powder coating furnace oven
ROMERCuring Oven SW Series
Call
Condition: new, Year of construction: 2025, Curing ovens shown in the photos can vary in price depending on size, configuration, and optional features. 💡📏⚙️
At ROMER, we manufacture both standard models and fully bespoke solutions, tailored to your process requirements. 🏭✅
Tell us your part size, line capacity, curing profile, and available space - and we will propose the best setup and the options that actually improve daily performance. 🔥🎯
🧠📡 Control and monitoring
Live process control for temperature, time, airflow, and modes - with alarms and saved recipes for repeatable cycles. 🔁✅
🔥🧩 Heating module
Fast heat-up and stable temperature thanks to efficient heating elements and quick energy transfer. ⚡🌡️
🌀💨 Air circulation
Uniform airflow reduces temperature differences for consistent coating quality. 🎯✅
🧱❄️ Insulation and design
Smart chamber construction minimizes heat loss - faster reaching setpoint, lower consumption. ♻️📉
🛡️⚠️ Safety and certification
Sensors, interlocks, and protection logic increase safety and reliability. 🔒👷
⚡💰 High efficiency
Optimized heat transfer and reduced losses mean real operating savings. 📉🔥
⏰🤖 Automatic start
Programmable schedule - automatic preheating before the shift for smoother production starts. ⏱️✅
🚪🔒 Self-latching doors + intelligent chimney
Prevents accidental opening, chimney activates only when needed for safer operation. 🧯✅
🌿🔋 ECO mode
Low-energy standby when idle - fuel consumption reduction up to 20% (depending on process). 🌱📉
👀💡 View and lighting
Inspection without opening the door - fewer temperature drops, easier supervision. ✨👁️
🛤️🔥 Guide rails + automatic hood
Heat hood runs only during loading to reduce temperature loss, automatic rail infeed improves ergonomics and loading speed. 🙌⚙️
🎛️🌡️ MULTI-ZONE HEAT
Independent zone control for uniform curing of parts with different mass and geometry. 🧩✅
Bsdpfjfzccnex Ap Ejdf
🧠♨️ MTS system
Heating elements mounted without thermal bridges - higher efficiency and faster time to set temperature. ⚡⏱️
2-in-1 🧱↔️🧱 Split chamber
Movable partition for two independent zones - drying and curing in one unit for maximum flexibility. 🚀🔁
🎚️🌀 VFD ventilation
Variable fan speed based on chamber conditions - better control and lower electricity use. ⚙️💡
Listing
Skarżysko-Kamienna
8,438 km
Powder furnace, industrial furnace
ROMERPiece SW
Call
Year of construction: 2020, condition: new, 7 "Touch Panel
Bdedpfx Apofy Txyo Eef
The large color touch panel looks aesthetically and is comfortable and intuitive to use. You will set all important parameters on it.
Memory of 20 programs with 10 events
It is possible to save up to 20 programs and activate up to 10 consecutive time-temperature events arranged in the heating curve.
This is especially needed for more demanding processes.
Information on gas / oil consumption
The consumption is calculated based on the burner settings. This feature will allow you to estimate the cost of a given cycle, plan consumption and check personnel. Dual-channel recorder of USB cycle parameters
Each furnace is equipped with a recorder that records all firing parameters, including two temperature channels - like in an airplane black box, on a USB flash drive.
The system also enables the analysis of monthly / daily statements, including media consumption and performance. Each start of heating, opening the door, can be recreated, a few years back.
Such a dedicated option is not offered by any manufacturer. It is a system developed from scratch by our programmers Automatic smoke exhaust chimney
The chimney can be programmed to open a few minutes before the end of the firing in order to smoke the chamber.
It can be remotely controlled from the panel, it does not need to be done mechanically as in most structures.
Minute forecast until the end
The cycle has started, how long will it end? calculating the heating dynamics, we will count it and show on the display how much longer it will take.
To open it, just pull the door. The lock has adjustable pressure of the door, to close it just push it, the lock will catch the door and automatically pull it back.
In order to minimize the effect of heating the hall when opening the door, a hood is installed above the door to remove some of the heat to other places. The MTS system was created to provide a real reading of the temperature of the furnace chamber.
Standard measurement is based on one temperature measurement which is often wrong.MTS is a system of many sensors located in the outermost places of the chamber. The multi-zone heating system ensures a firing quality that has been so far unique.
Each normal oven has only one heating zone and only one temperature measurement!
The multi zone heat system supports up to 8 independent heating zones in one oven.
Each heating zone has as many as 3 temperature sensors!
When there are temperature differences between zones, they are automatically equalized!
The system helps to combat the problem when elements of different material thicknesses enter the furnace.
Listing
Skarżysko-Kamienna
8,438 km
Powder coating furnace oven
ROMER/System malowania elektrostatycznegSL-Piec
Call
Year of construction: 2020, condition: new, 7" Touchpad
Large color touch panel looks aesthetically and uses comfortably and intuitively. Set on it all the important parameters.Memory 20 programs each with 10 events
You can save up to 20 programs and activate up to 10 consecutive events time-temperature arranged in the heating curve. This is especially needed for the more demanding process.Information about consumption of power
Consumption is calculated based on the settings of the burner. This feature will allow you to estimate the cost of the cycle, consumption and plan check staff.Recorder of cycle USB
Each of the ovens is equipped with two-channel temperature recording on USB flash drive..
Each file is automatically created and is responsible for a separate cycle are recorded temperature extremes, hour and minute measurement. Files are saved in * .csv (Excel sheet)
For all buyers the end of 2016 option is free, the competition for the option you have to pay up to several thousand euros.
Bdsdpefzkqmjfx Ap Eef
History 20 latest of burn
Something's wrong? and perhaps too few overbroad elements from the oven? Now you check thoroughly oldest and lastest burning parameters, how often took, whether cycle proceeds without any problems, what was the consumption and when they ran.
Start the oven automatically at 6 am
How many times have you stay after hours and expecting end of the cycle? If you own a powder coating plan that works for a long time, You know exactly what we are talking about.
With our solution you can leave cycle not cured in the oven, to automatically end when you come to the job next morning.
We make it easier for you to find: "forging furnace"
You will receive new offers immediately and free of charge via e-mail
You can easily terminate the search request at any time
Used Forging Furnace (938)
Search Machineseeker now with more than 200,000 used machines:Browse through the most popular machine descriptions:
This may be of interest to you


















































































































































































































